Piping verification requirement during nuclear power plant commissioning
基本信息
标准号:
GB/T 28550-2012e
名称:
核电厂调试阶段管道验证要求
英文名称:
Piping verification requirement during nuclear power plant commissioning
状态:
现行
类型:
国家标准
性质:
推荐性
发布日期:
2012-06-29
实施日期:
2012-11-01
废止日期:
暂无
相关公告:
暂无
阅读或下载使用APP、PC客户端等功能更强大
网页在线阅读体验阅读、搜索等基本功能
用户分享资源来自网友们上传分享的文件
纸书购买平台官方及网友推荐
分类信息
ICS分类:
【能源和热传导工程(27)核能工程(27.120)有关核能的其他标准(27.120.99)】
CCS分类:
【能源、核技术(F)电力(F20/29)电力试验技术(F24)】
行标分类:
暂无
描述信息
前言:
暂无
适用范围:
This standard specifies the verification methods and requirements on primary loop nuclear class piping during the commissioning of pressurized water reactor (PWR) nuclear power plant. This standard is applicable to the piping verification of nuclear island pre-operational commissioning phase in a pressurized water reactor nuclear power plants. Non-PWR nuclear power plants can follow the standard as well.
引用标准:
暂无
相关标准
引用标准:
GB/T 28548
GB/T 28549
DL/T 1103-2009
相关部门
发布部门:
China
China
of
of
of
of
of
Standardization
Administration
Administration
And
And
the
the
Republic
Republic
General
Quality
Supervision,Inspection
Quarantine
People's
People's